Your LAST Opportunity to Own Spacious, Luxury Townhomes at Stationwest in Burlington

  Adi Development Group has just introduced the final release at its highly-successful Stationwest community located steps to the Aldershot GO station. Designed by ICON Architects, the luxurious collection of only 16 executive townhomes offer the last opportunity to own a spacious, luxury home in the GTA’s most desired master-planned[…]

Read More »

LINK AND LINK 2 – CONNECTED TO THE COMMUNITY

The LINK community is starting to come together! The south road base material and the curbs are now being installed! The concrete sidewalk around the building will be poured this month and the grading around the site and road from Dundas Street will be connected to the building, providing access to the[…]

Read More »

LINK and LINK2 – Community Taking Shape

The LINK community is starting to come together! The south road base material and the curbs will be installed in the coming month. The concrete sidewalk around the building will be poured and the grading around the site and road from Dundas Street will be connected to the building, providing[…]

Read More »

LINK AND LINK 2 – A ROAD HOME

Our LINK community has the south road located off Sutton Drive base material installed. We are expecting the curbs to be installed in the coming weeks. At LINK 1, the Natura building windows are fully installed up to the 6th floor. The retail windows are complete and the doors are[…]

Read More »

LINK AND LINK 2 – THE YEAR OF THE MOVE

Happy New Year! The Link site continues to grow as we move into 2017. The main gas line work is complete and Union Gas meters are installed, the gas line is now to be connected and now the building can be heated. The south road base material has been installed[…]

Read More »

LINK AND LINK 2 – THE WAY TO YOUR HOME

Milestone by milestone, the Link community is progressing quickly. The main road of Sutton Drive will be taking shape in the coming weeks with the curbs to go along with it. Inside the construction site, the main gas line work is complete and Union Gas will be installing the meters.[…]

Read More »

LINK AND LINK 2 – ALL BUILDINGS ARISE!

The Link buildings will hit some major milestones in the month of November. The main gas line to the buildings will be installed next week, once that is complete, construction of the main entrance to the development will begin. The building’s major mechanical equipment has been delivered and installation will[…]